Home » News » Currently Reading:

Eni: new successes in the exploration activities in Indonesia and Libya

March 25, 2015 News No Comments

ENISan Donato Milanese (Milan), 16 March 2015 – Eni has completed post drilling studies on the Merakes-1 gas finding, located in the Indonesia deep offshore East Sepinggan Block, which indicates significant upside gas potential. Eni is the operator of the East Sepinggan Block with an 85% interest.

The new studies upgrade the potential of Merakes from previously estimated 1.3 TCF up to 2 trillion cubic feet (Tcf) of gas in place. The well was drilled in October 2014 in 1,372 metres water depth, encountering a 60 meter section of high quality sandstones. Eni will bring forward the appraisal programme to evaluate the possible fast track development of the finding, optimizing synergies with the near Jangkrik field, also operated by Eni.

The East Sepinggan block is located offshore of East Kalimantan (Borneo), 170 kilometres south of Bontang LNG plant and just 35 kilometres south of Jangkrik field.

Eni has been operating in Indonesia since 2001 and currently holds a large portfolio of exploration, production and development assets which have an increasing importance in contributing to the overall growth of the company. Eni’s average equity production in the Country amounts to 17,000 barrels of oil equivalent per day.

Additionally, Eni has made a significant discovery of gas and condensates offshore Libya, in the Bahr Essalam South exploration prospect in Area D, 82 kilometres from the coast and 22 kilometres from the production field of BahrEssalam. Eni, through its subsidiary Eni North Africa BV, is operator of Contract Area D with 100% working interest in exploration phase.

The discovery was made through the B1-16/4 well, drilled at a water depth of 150 metres, which encountered gas and condensates in the Metlaoui Formation of Eocene age. During the production test, constrained by surface facilities, the well produced 29 million square cubic feet per day (mmscfd) and above 600 barrels per day (bbpd) of condensate with “64/64‘ choke size. In a producing configuration the well is estimated to deliver in excess of 50 mmscfd and 1,000 bblpd of condensate. The proximity to the Bahr Essalam infrastructures will allow a quick development of this new discovery.

Eni is currently active in the country’s offshore with three drilling rigs used in the exploration and initial delineation of Contract Area D’s discoveries.

This exploration success further confirms the enormous potential of Libyan gas resources. The future development of Libyan resources will allow supporting the growth of the domestic consumption and industry, while maintaining Libya’s position as a strategic supplier for Italy and Europe. Eni started production in 2004 from the area D fields of Wafa and Bahr Essalam, which supply gas destined for domestic markets and Italy via the Greenstream sealine. These fields also yield high percentages of associated liquids.

With an important string of development projects in its pipeline, both ongoing and planned, Eni aims at capitalizing the significant commercial discoveries made in past years in Area D, and is undertaking an important exploration programme to support the constantly growing domestic demand. This discovery in the Bahr Essalam South exploration prospect very well fits with such project pipeline. Eni’s domestic deliveries grew from around 1 billion square cubic metres (Bscm) in 2009 to 4.3 Bscm in 2014, with the potential of reaching 6.2 Bscm in 2015.

Eni has been present in Libya since 1959 and currently produces approximately 350,000 barrels of oil equivalent per day in the country.

Comment on this Article:

You must be logged in to post a comment.

RSS Web Crewing Vacancies List

  • STEWARD / STEWARDESS March 14, 2019
    We are looking for A STEWARD or a STEWARDESS with experience on offshore units. Please send your application to [email protected] or register online at: https://application.intermarinegroup.com/
  • Chief Engineer on ASD TUG (ARAMCO)-250 USD per day March 7, 2019
    VSL’s type – ASD TUG (the vessel is operating under ARAMCO charter); Wages – before ARAMCO evaluation 150 USD per day and after the evaluation the salary will be 250 USD per day; Contract Duration: 3 months; Area of sailing – Saudi Arabia; Join date – ASAP; Comments: The candidate must hold Chief Engineer’s License. […]
  • 2nd Engineer on AHTS DP2 (ARAMCO)-200 USD per day March 7, 2019
    VSL’s type – AHTS DP2 (the vessel is operating under ARAMCO charter); Wages – before ARAMCO evaluation 100 USD per day and after the evaluation the salary will be 200 USD per day; Contract Duration: 3 months; Area of sailing – Saudi Arabia; Join date – ASAP; Comments: The candidate must hold Second Engineer’s License […]
  • VTS operator March 7, 2019
    VTS operators required for Saudi Arabia, Persian Gulf side: 1. He/She shall have a Marine Certificate of Competency Class III (II/1) 2. He/She shall have at least two (2) years’ experience in VTS systems and port operations. 3. He/She should have IALA VTS Operator Certificate. • 1-Year Contract • Rotation 4 months ON 2 OFF […]

Subscribe to our News Updates

Enter your email address:

Search Box

Featured News

JFC announces new jobs with Launch of new Marine Division

8 Nov 2015

John Concannon, MD. JFC Manufacturing announces details of new jobs, at the ‘Innovating the future of Marine Navigation Safety’ conference in Galway on Friday 16th October, at the launch of the west of Ireland company’s new division, JFC Marine. The …

The 2015 Irish Maritime Forum

6 Oct 2015

The 2015 Irish Maritime Forum, attended by over 150 delegates, discussed the importance of the Maritime Industry to Ireland’s continued economic growth and how solutions to a number of the world’s great challenges will come from the Sea. The National …

Wärtsilä propulsion solution chosen for new Scottish fishing vessel

12 Jul 2015

A new modern fishing vessel being built by Simek AS in Norway on behalf of the U.K. operator Antares (Whalsay) Fishing Company Ltd, will feature an integrated Wärtsilä propulsion solution including main engine, controllable pitch propeller and gearbox. The Wärtsilä …

Eni announces a new oil and gas discovery in the Western Desert of Egypt

27 Jan 2015

In the last three years, in the Western Desert of Egypt Eni has doubled its oil production through exploration of deep sequences. San Donato Milanese, 22 January 2015 – Eni has announced a new discovery of oil and gas in the …

Archives

Latest Comments

Companies Directory