Home » News » Currently Reading:

Eni sanctioned the OCTP project in Ghana

February 1, 2015 News No Comments

ENIEni, Vitol and GNPC signed with the President of Ghana and the Minister of Petroleum the agreement to proceed with the OCTP project. The project will provide domestic gas supply to Ghana’s thermal power plants for more than 15 years

The Offshore Cape Three Point (OCTP) project will provide domestic gas supply to Ghana’s thermal power plants for more than 15 years

San Donato Milanese (Milan), 27 January 2015 – Eni, Vitol and Ghana National Petroleum Corporation (GNPC) signed today with the President of the Republic of Ghana, John Dramani Mahama, and the Minister of Petroleum, Emmanuel Armah-Kofi Buah, the agreement to proceed with the OCTP integrated oil & gas project in Ghana. First oil is expected in 2017, first gas in 2018 and the peak production will be 80,000 boed in 2019.

The OCTP integrated project is a deep offshore development located approximately 60 km from the Ghanaian Western Region’s coast. It comprises oil and non-associated gas fields and will access around 41 billion cubic meters (1.45 Tcf) of gas and 500 million barrels of oil in place.

The integrated nature of the oil and gas development provides an economically robust project allowing the Country to achieve a competitive gas price which will support its economy. Furthermore, the OCTP fields will continuously supply Ghana’s thermal power system, from  2018 to 2036. The supply will be secured thanks to long term contracts with the Government of Ghana. Beside, the Country will also benefit from additional oil production starting from 2017 through GNPC’s participation in the project and royalties and taxes generated by the production, together with employment and further development of local content.

The project will have a minimal environmental impact being designed for zero flaring and zero discharge. The non-associated gas will provide environmental benefits feeding both existing power plants, replacing light crude oil, and new power plants, expanding the power generation capacity of the Country.

“The OCTP development is a robust integrated oil and gas project that will provide the reliable energy source needed to accelerate the economic growth of Ghana by delivering a domestic solution to feed the power sector. The sanction of this significant project comes after less than 2 years from the completion of a successful exploration campaign. Once again, in  the best tradition of Eni, we deliver fast-track organic growth addressing in a sustainable manner the energy requirements of the host country, in line with the Eni model in Africa‘, Eni’s CEO Claudio Descalzi said.

Eni, through its own subsidiary Eni Ghana, is block OCTP’s operator with a 47,22% stake. Other partners are Vitol with 37,77% and GNPC with 15%.

Eni has been operating in Ghana since 2009. In the Country it has also launched social programs, such as the Health Project in the Western Region for the benefit a population of more than 300,000 people.

Eni has been present in Sub-Saharan Africa since the ”60s and is currently involved in exploration and production projects in Angola, Congo, Ghana, Gabon, Mozambique, Nigeria, Kenya, Liberia and South Africa. Eni currently produces around 450,000 boed in Sub-Saharan Africa, thanks to successful and rapidly growing exploration activity.

Comment on this Article:

You must be logged in to post a comment.

RSS Web Crewing Vacancies List

  • Crane Operator at OSV DP2 April 2, 2018
    Crane Operator VSL’s type – OSV DP2; Wages – 285 USD per day; Contract Duration: 7 weeks; Area of sailing – Angola; Join date – Beginning of September; Comments: The candidate must hold Crane Operator’s License (ICS Certified) min. 200 MT; Minimum obligatory experience – 4-5 years actual on board in the rank; Age Limit […]
  • 3rd Engineer at Cable Layer DP2 April 2, 2018
    3rd Engineer VSL’s type – Cable Layer DP2 (the vessel is working under ARAMCO charter); Wages – 100 USD per day; Contract Duration: 4 months; Area of sailing – Saudi Arabia; Join date – ASAP; Comments: The candidate must hold 3rd Engineer’s Unlimited License, DP Maintenance Certificate; Minimum obligatory experience – 12 months on DP […]
  • Pumpman (Cargo Operator) April 2, 2018
    We are looking for Pumpman (Cargo Operator) Start: Asap Day rate: negotiable Requirements: 3 years experience as Pumpman on oil tankers (VLCC experience preferred) • STCW Reg AII/4 certification. • Understanding of Permit to Work systems; Mechanical Isolation Standards, Risk Assessment and COSHH • Medically fit to offshore International standards such as ENG1 or equivalent.
  • Gas Engineer at VLGC April 1, 2018
    TOP URGENT! We need GAS/ENG for newbuilt LPG 50.000 DWT. (min 15 months experience in the same rank position on the same type of vessels). Traiding area – world wide. Crew on board – mixed, good english is a must. Age limit – below 55 years old Please contact us tel/Viber 380634544252 or send your […]

Subscribe to our News Updates

Enter your email address:

Search Box

Featured News

JFC announces new jobs with Launch of new Marine Division

8 Nov 2015

John Concannon, MD. JFC Manufacturing announces details of new jobs, at the ‘Innovating the future of Marine Navigation Safety’ conference in Galway on Friday 16th October, at the launch of the west of Ireland company’s new division, JFC Marine. The …

The 2015 Irish Maritime Forum

6 Oct 2015

The 2015 Irish Maritime Forum, attended by over 150 delegates, discussed the importance of the Maritime Industry to Ireland’s continued economic growth and how solutions to a number of the world’s great challenges will come from the Sea. The National …

Wärtsilä propulsion solution chosen for new Scottish fishing vessel

12 Jul 2015

A new modern fishing vessel being built by Simek AS in Norway on behalf of the U.K. operator Antares (Whalsay) Fishing Company Ltd, will feature an integrated Wärtsilä propulsion solution including main engine, controllable pitch propeller and gearbox. The Wärtsilä …

Eni announces a new oil and gas discovery in the Western Desert of Egypt

27 Jan 2015

In the last three years, in the Western Desert of Egypt Eni has doubled its oil production through exploration of deep sequences. San Donato Milanese, 22 January 2015 – Eni has announced a new discovery of oil and gas in the …

Archives

Latest Comments

Companies Directory